The basic category is the content that meets the residential safety needs and basic living needs of residents.
At the construction site of Tianjin Metro Line 10, thousands of curved "cement rings" are arranged on the open space.
With this transfer, the three batches of residential land transfer in Guangzhou have been completed this year.
The quality of urban construction has been continuously improved, and the prefabricated construction work has been steadily expanded.
Jiangsu is a major economic province, a major energy-consuming province, and a major carbon-emission province.
It is reported that at present, Wushan Town has built 38 farm houses with a construction area of 4840.3 square meters, and 129 farm houses under construction with an area of more than 15,400 square meters.
Since the dual-carbon target was put forward, various industries in China have set off a green development boom.
BIM is based on various relevant information data of construction projects to build architectural models, so that design, construction, and management work under one platform.
With the increasing number of prefabricated buildings in Hefei, the quality of parts and components has been paid more and more attention.
Metro Line 14 starts at Gangxia North Station in Futian District and ends at Shatian Station in Pingshan District.
Cooperation hotline: 400-828-1019
QQ customer service: 1575099316
Wechat customer service: 13327892019
Email: info@precast.com.cn
Changzhou Creative Industry Park e727-728
24 Hours, Monday - Friday