What does Chongqing’s first prefabricated public building look like? Shaped like a butterfly with spread wings and dressed in colorful "dazzling clothes"

Author:www.new.qq.com

Time:08/07/2021

It was learned from the Chongqing Real Estate Group that the Chongqing Municipal Youth Activity Center, a key municipal project built by Chongqing Urban Construction Development Co., Ltd., a subsidiary of Chongqing Real Estate Group and constructed by China State Construction Technology, has completed the main body construction a few days ago. As the city's first all-steel prefabricated public building, what does the project look like? The reporter will inquire for you in advance.


Youth Palace, Building 1, Chongqing Youth Activity Center under construction


Shaped like a butterfly, built on a hill and built on a platform, shaped like two dancing "butterflies"


The Chongqing Youth Activity Center project is located in Liangjiang New District, and its construction site is on the east side of Chongqing Garden Expo Park.


According to Huang Wei, the person in charge of the project, the total land area of the project is about 146.86 mu and the total construction area is 47572.89 square meters. The project consists of 1# building as a youth palace, including practical experience, teaching training, calligraphy and painting exhibition hall and other multi-functional halls. Building 2# is divided into two units. Unit A is the children’s library, unit B is the stage, lecture hall, training and guidance center and other public rooms.


The leader of the project concept plan is the famous Chinese architect Cui Kai, with the design concept of building a platform by mountains, a garden with mountains and rivers, and colorful paper-cutting as the design concept. The design is inspired by the "butterfly" paper-cutting, and the agile form is like a butterfly, flying above the earth and blending with the landscape of Chongqing. The graceful and soft building curves and colorful lighting effects make the night view of Chongqing Youth Activity Center more charming.


Inside the Children's Library, Building 2, Chongqing Youth Activity Center


Steel structure as bone

The assembly rate of the first all-steel prefabricated building reached 76.9%


In recent years, Chongqing has continued to promote the development of prefabricated buildings. According to the relevant person in charge of the Municipal Housing and Urban-Rural Construction Committee, in order to accelerate the modernization of Chongqing's construction industry and promote the improvement of construction level and construction quality, Chongqing will strive to start construction of more than 15 million square meters of prefabricated buildings this year.


The Chongqing Youth Activity Center project is a microcosm of Chongqing's promotion of prefabricated construction. As the city's first all-steel assembly building, the project used 11 thousand tons of steel and the assembly rate reached 76.9%. All the components and accessories were shipped from the prefabricated building materials base of China State Construction Engineering Co., Ltd. in Chengdu.


The reporter saw at the scene that the main steel structure of the project has been completed and 80% of the profiled steel plates have been laid. The interior decoration is expected to be completed by the end of the year and the construction is expected to be completed next year.


Effect Picture of Chongqing Youth Activity Center


Draped clothes

Different angles and different lighting, the exterior wall presents a "colorful" effect


As Chongqing's urban cultural business card and an internationally-oriented landmark building in the new era, the Chongqing Youth Activity Center project is a multifunctional, digital, low-carbon, energy-saving, and environmentally-friendly public service complex. The project party builds a BIM operation and maintenance management platform, integrates BIM intelligent applications such as the design of integrated wiring, construction and construction simulation, operation and maintenance safety management, smart classrooms, human-computer interaction functions, children's palace cloud management, cloud library comprehensive management, etc., to realize the whole process management of design, construction, operation and maintenance.


It is understood that the roof decorative grid of the project is decorated with 500-50 mm hyperbolic variable cross-section bending and torsion components, which is extremely difficult to process and install. To this end, the project party uses BIM technology to deduced, measuring robots on-site scanning, 3D modeling, and realizing simulation construction. The use of the latest technological coatings also makes the facade present a magical colorful effect. From different angles and different illuminations, the colors and shapes presented are different, putting a colorful "dazzling clothes" on the Chongqing Youth Activity Center. ".



Contact us

Cooperation hotline: 400-828-1019

QQ customer service: 1575099316

Wechat customer service: 13327892019

Email: info@precast.com.cn

ADDRESS

Changzhou Creative Industry Park e727-728

Working hours

24 Hours, Monday - Friday