The Xinyang Jianye Huaibin Guiyuan Project of Drawin Group Henan Headquarters won the "Structural Jigongshan Cup" Award of Xinyang City

Author:Drawin Group

Time:22/01/2021


Recently, the Huaibin Jianye Guiyuan 1# and 3# building project undertaken by Drawin Group Henan Headquarters won the "Structural Jigongshan Cup" Project Award issued by Xinyang Construction Engineering Quality Supervision Station.


Huaibin Jianye Guiyuan Project is located in the north of Qingnian Street, east of Bailuhe Road, and south of Langan Street in Huaibin County. The total construction area of the project is about 119,200 square meters. Among them, 99,200 square meters above ground and 20,000 square meters underground, including 9 residential buildings, 1 kindergarten, underground garage and power distribution room. The project started construction in October 2019 and is expected to be completed and accepted in October 2021.


Project renderings


At the beginning of the project’s entry into the site, the excellent planning was carried out in advance, and the on-site construction management was carried out with high standards, mainly reflected in five aspects: Firstly, expanded metal meshes are used on the facades of the project, which significantly improves the overall image of the project. Second, the cantilever frame adopts a new type of flower basket bolt cantilever scaffold, which effectively reduces the hidden danger of external wall leakage under the premise of ensuring safety. The third is that the main stage reinforcement system adopts a new generation of steel backing, which greatly improves the construction quality of concrete structures. The fourth is to strictly implement the model-first and first-line recognition system on site, and conduct model review before the start of each process. The fifth is to clarify the on-site construction standards, and the on-site quality is always in a controllable state, and it has repeatedly ranked first in third-party inspections.


The person in charge of the project said that building a project will build a monument! In the next step, the project management team will continue to complete project construction with high standards and high quality, ensure high-quality project performance, and create high-quality projects and benchmark projects.



Contact us

Cooperation hotline: 400-828-1019

QQ customer service: 1575099316

Wechat customer service: 13327892019

Email: info@precast.com.cn

ADDRESS

Changzhou Creative Industry Park e727-728

Working hours

24 Hours, Monday - Friday