Capacity supply has increased again!Drawin Group's Nantong Green Building Technology Park was put into operation

Author:Drawin Group

Time:20/01/2021

The first batch of PC component products shipped out


On December 30, the Nantong Green Building Science and Technology Park in East China of Drawin Group held a commissioning ceremony, marking the official opening of the Science and Technology Park.


Nantong Green Building Technology Park renderings


Nantong Green Building Technology Park (hereinafter referred to as "Nantong Factory") is located in Shizong Town, Tongzhou District, Nantong City. It is one of the major investment promotion projects in Nantong City. The project started construction in September this year and officially went into production on December 30. This is the sixth green building technology park of Drawin Group to be put into operation in 2020. The project occupies a total area of about 100 acres. There are four production lines in the factory, including an intelligent dual-cycle integrated production line, a long-line table mold production line, a fixed table mold production line, and a reinforced concrete production line. It can produce standardized PC components for prefabricated buildings of various types of structural systems. The designed annual production capacity of the factory is 150,000 cubic meters. The service radius of the park covers Nantong, Shanghai, Suzhou, Wuxi, Yancheng, Taizhou and other places.


Commencement ceremony


The person in charge of the Nantong plant said that the Nantong plant has obvious location advantages and huge market potential. In the future, it will work with partners to serve the market, and share resources and complement each other with other factories in Drawin Group such as Kunshan Green Building Technology Park to form a linkage. Build a prefabricated construction industry cluster in the Yangtze River Delta, further expand the group's brand influence and market share in the Yangtze River Delta region, and build the largest prefabricated building industrial base group in the growth triangle.


Within one year, Drawin Group realized the six green building technology parks in Zhoukou of Henan, Huai'an and Nantong in Jiangsu, Yuxi in Yunnan, Huidong in Guangdong, Jiaozhou in Shandong, and the Drawin Intelligent Manufacturing and Decoration Industrial Park in Kaifeng, Henan, and a total of seven parks were put into operation, expanding national production capacity.



Contact us

Cooperation hotline: 400-828-1019

QQ customer service: 1575099316

Wechat customer service: 13327892019

Email: info@precast.com.cn

ADDRESS

Changzhou Creative Industry Park e727-728

Working hours

24 Hours, Monday - Friday