The main body of the first prefabricated building shed renovation project in Xinyu City, Jiangxi Province was successfully capped!

Author:www.thepaper.cn

Time:28/09/2022

On September 21, good news came from the one-yard shed renovation project undertaken by the Municipal Investment Control Group. The 7 main bodies of the first shed renovation project using prefabricated buildings in Xinyu City were successfully capped.




As a livelihood project for Xinyu residents, the one-yard shed renovation project is located in Beihu Area, Yushui District, with a total construction area of about 89,000 square meters and 542 new resettlement houses. The project adopts prefabricated construction technology, with an assembly rate of 30%, and uses technological means to create high-quality livelihood projects.


Walking into the residential building of the large courtyard shed conversion project, the reporter saw that the internal environment of the room is not like the traditional building that has just been completed, and one foot can bring a piece of dust. The walls are smooth and flat on one side, and when you touch them with your hands, there is absolutely no roughness and unevenness of traditional construction walls. This eliminates the need for plastering and other processes for the exterior wall in the later stage of traditional buildings, thereby eliminating the common quality and safety problems of traditional exterior walls such as cracking of the plastering layer, hollowing and falling from high altitudes.


It is understood that the development of prefabricated buildings is a major change in the construction method in my country. It transforms the traditional extensive construction method into an intensive industrialized work method, improves production efficiency and building quality, saves resources and energy, and reduces the burden of The impact of the surrounding environment, dust and noise pollution can be more effectively controlled, in line with the requirements of the latest national environmental protection policies. Prefabricated buildings, simply put, are factory-made parts and assembled houses on site. Compared with traditional hand-built houses, prefabricated buildings mainly have the advantages of environmental protection, lightening labor intensity, reducing costs, improving project quality and construction efficiency.


Since the start of the project, CIC Group has always adhered to a standardized, standardized, and refined management model. All participants in the project have always maintained a concentric mindset, a common goal, and synchronized actions, and actively overcome the impact of external adverse factors such as the epidemic and weather. Take the initiative to overcome difficulties, seize effective construction time, strictly control safety, quality, and progress to ensure high-quality construction of the project, and strive to create high-quality and bright livelihood projects.


Feng Qiwei, the project leader of the Municipal Investment Control Group, said that with the completion of the main structure of the seven main buildings, the project will be transferred to the secondary structure construction, interior and exterior wall painting and interior decoration, outdoor and supporting projects. The Municipal Investment Control Group will continue to take a pragmatic work style, and solidly promote the construction work of the next stage of the project according to the quality and quantity, so as to ensure that the resettled people realize their "dream of living in peace" as soon as possible.



Contact us

Cooperation hotline: 400-828-1019

QQ customer service: 1575099316

Wechat customer service: 13327892019

Email: info@precast.com.cn

ADDRESS

Changzhou Creative Industry Park e727-728

Working hours

24 Hours, Monday - Friday