The Economic Development Zone of Bengbu City, Anhui Province creates a provincial-level prefabricated construction industrial park to realize the "Four Values"

Author:www.baijiahao.baidu.com

Time:26/09/2021

Realize the "leading value" of demonstration and leadership. The prefabricated construction industrial park of Bengbu Economic Development Zone takes the green building industrial park project of Anhui Jiangong Jiahe Construction Industry Co., Ltd. as its industrial base, and establishes the development direction of "high-end intelligence, modern services, and green ecology", forming a provincial-level building technology innovation "production, learning, and research" integrated base. It will help promote the rapid development of the prefabricated construction industry in Bengbu City and even the whole province, and stimulate the entire industrial chain of tens of billions of yuan upstream and downstream of the surrounding transportation, logistics, building materials, construction and labor markets.


Realize the "social value" of green environmental protection. Create a full life cycle operation and management service model for prefabricated buildings, with new building industrialization, energy saving and environmental protection and new building materials as the core business, forming a development advantage in the entire industry chain of prefabricated buildings. Through the whole life-cycle green building industry chain integrating investment, planning, design, production, construction, operation and maintenance, new materials and new technologies are formed by the on-site prefabrication of traditional building materials and complementary construction techniques to achieve the end-use goal of ultra-low energy consumption.


Realize the "industrial value" of rapid development. Taking "build a house like a car, buy a house like a supermarket" as the core concept of the prefabricated construction park, we have introduced a number of well-known enterprises and adopted the technology of design standardization, production factoryization, on-site assembly and full-process management information. The construction speed is 1.6 times that of traditional buildings. At the same time, construction waste is greatly reduced, and the industrialization process of the construction industry is rapidly promoted to realize the transformation and upgrading of the construction industry.


Realize the "public welfare value" of energy saving and emission reduction. Realize production factoryization and on-site assembly. Compared with traditional cast-in-place, pollution sources such as dust, noise and sewage are greatly reduced during the construction process, achieving water saving of 80%, energy saving of 40%, and material saving of more than 20%. From the source, the emission of construction waste has been greatly reduced, which is in line with the national energy-saving emission reduction and green development goals.



Contact us

Cooperation hotline: 400-828-1019

QQ customer service: 1575099316

Wechat customer service: 13327892019

Email: info@precast.com.cn

ADDRESS

Changzhou Creative Industry Park e727-728

Working hours

24 Hours, Monday - Friday